Commercial
3 Miami Central

The project consisted of the construction of a 12-story, Type 1A, mixed-use building with approximately 595,146 SF. The 33,143 SF ground floor has a black box retail and restaurant space, a loading dock area, car rental offices, electrical rooms, fire control room, and a double helix ramp for restricted access to the second level parking and parking from the third level up. The parking garage contains 1,096 spaces from level 2 through 8. The common core area and 85,077 SF of shell office space is located between levels 9 through 12.

project details

CLIENT

All Aboard Florida

DELIVERY

GC (Design-Bid-Build)

LOCATION

Miami, Florida

SIZE

595,000 SF

dISCLAIMER

PROJECT EXPERIENCE ACQUIRED BY NV2A PRINCIPALS AND KEY STAFF WHILE WORKING AT PREVIOUS FIRMS.

FEATURED PROJECTS

The Keeley Pavilion & Parking Garage 13 
South Dade Transit Operations Center
Dadeland South Intermodal Station
Gulliver Upper Campus Complex
Baptist Parking Garage 7
The Underline - Phase 3
The Gardens Residences
Key West International Airport, Concourse A & Terminal Improvements
Bal Harbour Waterfront Park & Community Center
The Center for Student Life at Gulliver Prep