Commercial /
3 Miami Central

The project consisted of the construction of a 12-story, Type 1A, mixed-use building with approximately 595,146 SF. The 33,143 SF ground floor has a black box retail and restaurant space, a loading dock area, car rental offices, electrical rooms, fire control room, and a double helix ramp for restricted access to the second level parking and parking from the third level up. The parking garage contains 1,096 spaces from level 2 through 8. The common core area and 85,077 SF of shell office space is located between levels 9 through 12.

project details

CLIENT

All Aboard Florida

DELIVERY

GC (Design-Bid-Build)

LOCATION

Miami, Florida

SIZE

595,000 SF

dISCLAIMER

PROJECT EXPERIENCE ACQUIRED BY NV2A PRINCIPALS AND KEY STAFF WHILE WORKING AT PREVIOUS FIRMS.

FEATURED PROJECTS

Dadeland South Intermodal Station
Gulliver Collaborative Learning Building
Baptist Parking Garage 7
The Underline - Phase 3
The Gardens Residences
Key West International Airport, Concourse A & Terminal Improvements
Bal Harbour Waterfront Park & Community Center
The Center for Student Life at Gulliver Prep
Optima Onyx Tower
Lyric Point