The Project includes the design and construction of various improvements to the existing Dadeland South Metrorail Station, located in Datran Center. Improvements include new canopies on the BRT platform, Metrorail platform, reconfiguration of the drop-off/pick-up area north of the station for easier vehicular and pedestrian access, design and construction of an at-grade bike path connection to connect with The Underline and the South Dade Trail (adjacent to the Transitway); improvements to the existing amenities such as facility technologies, barrier and security systems, bicycle amenities, lighting, landscape and hardscape elements, climate control systems, wayfinding signage, and vertical circulation elements, Metrorail guideway structural and drainage improvements; site improvements to adjacent roadways, signalized intersections and the surface park-and-ride lot north of the station area. The Project is targeting LEED for Transit Stations “Silver”-level certification.
Mutual partnership through a straightforward prequalification process. All subcontractors welcome and required to register to be eligible to contract work with our company.
You have an important investment in your hands, and we are the right construction partner for it. Let us take it to the next level together.
We set out to hire the best talent in our industry. Join our collaborative team of professionals and help achieve our mission.
Links of Interest
Contact