Metrorail Orange Line Extension

The project is a 2.4-mile double-track, heavy civil rail extension of the Metrorail that runs from the existing Earlington Heights station to the Miami Intermodal Center (MIC), where passenger are able to connect to the Miami International Airport (MIA). Major project components included the construction of an elevated guideway, including segmental construction of a three-level Metrorail station; operating systems; trackwork; three traction power substations; new roadways, roadway reconstruction; and civil sitework. The operating systems require the design, furnishing and installation of power distribution; train control, signaling and integration at the existing central control; communications; variable message signs; system control and data acquisition (SCADA).

project details

CLIENT

Miami-dade Transit

DELIVERY

GC, DESIGN-BUILD (SYSTEMS)

LOCATION

MIAMI, FLORIDA

SIZE

2.4-MILE DOUBLE-TRACK, ELEVATED RAIL AND PASSENGER STATION

dISCLAIMER

PROJECT EXPERIENCE ACQUIRED BY NV2A PRINCIPALS AND KEY STAFF WHILE WORKING AT PREVIOUS FIRMS.

FEATURED PROJECTS

The Keeley Pavilion & Parking Garage 13 
South Dade Transit Operations Center
Dadeland South Intermodal Station
Gulliver Upper Campus Complex
Baptist Parking Garage 7
The Underline - Phase 3
The Gardens Residences
Key West International Airport, Concourse A & Terminal Improvements
Bal Harbour Waterfront Park & Community Center
The Center for Student Life at Gulliver Prep